Machinary Management
|
|
As part of an overall restructuring, Recently PEYCHIN CONSTRUCTION CO. set up a specialized Machinery and Equipment Department charged with the task of managing the company's growing fleet. The main goal of the reorganization was to increase responsiveness to the constantly changing requirements of project execution, achieve greater flexibility and efficiency, and allow project managers to focus on the financial and technical aspects of the project.
Our Machinery and Equipment Department is firmly committed to the principle that service and maintenance should not be looked at as a drain on income. Rather, they should be considered a contribution to output. Moreover, the department establishes a win-win relationship with all project managers in order to implement its maintenance programs successfully.
By employing highly qualified personnel, and utilizing state-of-the-art IT technologies to gather, analyze and process information, the Machinery and Equipment Department uses key performance indicators to measure its success in achieving the following objectives:
|
To increase availability of equipment.
|
|
To reduce long-term maintenance cost.
|
|
To follow a scheduled program, including predictive and preventive maintenance, rather that taking an emergency approach.
|
|
To reduce the need for general overhauls.
|
|
To reduce the probability of a fault, which statistics have shown may occur within a period of time, thus increasing Mean Time Between Failures.
|
Some of the PEYCHIN CONSTRUCTION CO. Equipment are as below list.
|
Bulldozer
|
Loader
|
Truck
|
Truck Mixer
|
Light Vehicle
|
Grader
|
Roller Compactor ( CA25)
|
Excavator
|
Mobile Crane
|
Tower Crane
|
Concrete Pump
|
Batching Plant
|
Crusher
|
Diesel Generator
|
Compressor
|
Trailer
|
Welding Rectifier
|
Surveying Total Station
|
Industrial Heavy Lift
|
Shop Equipments (Scaffolding, Mold,…)
|
|
|